onsemi NSV50150ADT4G

onsemi NSV50150ADT4G electronic component product image

Images are for reference only

Manufacturer
Manufacturer No
NSV50150ADT4G
Quantity
1,012
Availability
In Stock
Package
TO-252-3, DPAK (2 Leads + Tab), SC-63
Packaging
Tape & Reel (TR); Cut Tape (CT)
Description
IC CURRENT REGULATOR 10% DPAK
Detailed Description
Current Regulator Regulator High/Low-Side 150mA ~ 350mA DPAK
Datasheet
Payment
PayPalEast West BankVISAMastercardWestern Union
Delivery
DHLFedExUPSTNT
AS9120
ISO 13485
ERAI Member
VDE
ISO 9001
ISO 14001
Five-Star After-Sales Service Certification
Bavarian Chips Alliance
UKAS Management Systems
ANAB ISO/IEC 17021
IAF
Grade
Automotive
Series
-
Accuracy
±10%
Function
Current Regulator
Packaging
Tape & Reel (TR); Cut Tape (CT)
Manufacturer
onsemi
Mounting Type
Surface Mount
Qualification
AEC-Q101
Package / Case
TO-252-3, DPAK (2 Leads + Tab), SC-63
Sensing Method
High/Low-Side
Voltage - Input
50V
Current - Output
150mA ~ 350mA
Base Product Number
NSV50150
Operating Temperature
-55°C ~ 175°C
Supplier Device Package
DPAK
AttributeValue
GradeAutomotive
Series-
Accuracy±10%
FunctionCurrent Regulator
PackagingTape & Reel (TR); Cut Tape (CT)
Manufactureronsemi
Mounting TypeSurface Mount
QualificationAEC-Q101
Package / CaseTO-252-3, DPAK (2 Leads + Tab), SC-63
Sensing MethodHigh/Low-Side
Voltage - Input50V
Current - Output150mA ~ 350mA
Base Product NumberNSV50150
Operating Temperature-55°C ~ 175°C
Supplier Device PackageDPAK

Purchase & Inquiry

Placing an Order

You can place an order with FIXCHIPS without having to register or create an account.

Payment Options

To make payment more convenient, we support multiple payment methods in USD, including PayPal, credit cards, and wire transfer.

RFQ (Request for Quote)

We suggest submitting an RFQ to get the most up-to-date pricing and availability for the components you are looking for. Our sales team will reply by email within 24 hours.

Important Notes

1. An email containing your order details will be sent to your inbox. If you cannot find it, please check your spam or junk mail folder.

2. Product availability and pricing may change over time. Our sales manager will verify the details of your order and contact you if any changes or confirmation are required.

Packaging Process

Product before packing
Step1: Product
Product in vacuum packaging
Step2: Vacuum Packaging
Product in anti-static bag
Step3: Anti-Static Bag
Individual packaging box
Step4: Package Boxes
Packaging box with shipping label
Step5: Bar-Code Shipping Tags
Shipping by cargo vessel
Step6: Shipping